Command dashboard
Baseline peacetime posture — Normal consumption, all access routes open.
Source update: Not recorded
Last refreshed: —
Readiness Analytics
Readiness Over Time
Readiness by Site
7 Sites with unavailable readiness
Readiness calculation
Existing formula: equipment 50% (FMC = 1, PMC = 0.5, NMC = 0); personnel 25% (available / required, capped at 1); fuel 25% (days / 14, capped at 1). Overall = mean of non-Planned sites with calculable readiness. Scenario factors affect support indicators, not this existing score.
Infrastructure and maintenance are displayed separately; no new weights assigned.
Site Readiness & Health Matrix
| Site ID | Site name | Category | Readiness | Equipment FMC / PMC / NMC | Personnel availability | Power redundancy | Fuel autonomy | Open findings | Maintenance status | Last update |
|---|---|---|---|---|---|---|---|---|---|---|
BTN-ITB | Batanes | Planned | Unavailable | 0 / 0 / 0 | Unavailable | Unavailable | Unavailable | 0 | 0 Overdue | Not recorded |
SPY-S01 | Location not entered | Planned | Unavailable | 8 / 0 / 0 | Unavailable | Unavailable | Unavailable | 0 | 0 Overdue | Not recorded |
SPY-S02 | Location not entered | Planned | Unavailable | 8 / 0 / 0 | Unavailable | Unavailable | Unavailable | 0 | 0 Overdue | Not recorded |
SPY-S03 | Location not entered | Planned | Unavailable | 8 / 0 / 0 | Unavailable | Unavailable | Unavailable | 0 | 0 Overdue | Not recorded |
SPY-S04 | Location not entered | Planned | Unavailable | 8 / 0 / 0 | Unavailable | Unavailable | Unavailable | 0 | 0 Overdue | Not recorded |
SPY-S05 | Location not entered | Planned | Unavailable | 8 / 0 / 0 | Unavailable | Unavailable | Unavailable | 0 | 0 Overdue | Not recorded |
SPY-S06 | Location not entered | Planned | Unavailable | 8 / 0 / 0 | Unavailable | Unavailable | Unavailable | 0 | 0 Overdue | Not recorded |
ILN-LAO | Ilocos Norte | Active | 65% | 1 / 0 / 1 | 38 / 40 | Not redundant | 9 d | 3 | 0 Overdue | Not recorded |
BTN-MAV | Batanes | Active | 69% | 2 / 2 / 0 | 18 / 22 | Not redundant | 6 d | 3 | 0 Overdue | Not recorded |
CAG-LAL | Cagayan (Lal-lo) | Staging | 70% | 1 / 1 / 1 | 64 / 80 | Available | 18 d | 2 | 0 Overdue | Not recorded |
Asset Health & Reliability
Asset condition distribution
Recorded health trends
| Asset | Communication status | Health Index | MTBF / MTTR |
|---|---|---|---|
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable | |
| Unknown | Unavailable | Unavailable / Unavailable |
Recorded telemetry only. No heartbeat does not establish equipment failure.
Maintenance & Work Orders
Maintenance backlog by category
Inventory schedules only; work order IDs, priority, teams and duration are not recorded.
Logistics & Infrastructure Readiness
Fuel autonomy by site
Personnel availability
Infrastructure support
Fuel volume, consumption rates, certifications, facility condition and environmental alarms remain unavailable unless recorded.
Findings & Resolution Center
Severity distribution
| Severity | Finding ID | Site | Assigned owner | Finding description |
|---|---|---|---|---|
| Warning | BTN-MAV | Logistics Bn | Fuel autonomy 6.0 d below 7 d minimum. | |
| Warning | BTN-MAV | Engineer Bn | No power redundancy: 1 serviceable generator(s), grid backup absent. | |
| Warning | BTN-MAV | Personnel J1 | Manning 18/22 required. | |
| Warning | CAG-LAL | Personnel J1 | Manning 64/80 required. | |
| Warning | CAG-LAL | Logistics Bn | TRK-HVY-0141 not mission capable. | |
| Critical | ILN-LAO | Engineer Bn | No power redundancy: 0 serviceable generator(s), grid backup absent. | |
| Warning | ILN-LAO | Personnel J1 | Manning 38/40 required. | |
| Warning | ILN-LAO | Engineer Bn | GEN-150-0312 not mission capable. | |
| Warning | ISA-MEL | Radar Sqn 2 | RAD-MOB-0210 not mission capable. |
Rule findings are recalculated from the current scenario. Detection dates, resolution status and aging are not recorded.
All feasibility findings →